Maryland DE completes one year on-site review and inspection of FODS Trackout Control System. The Department issues provisional approval allowing local Soil Conservation Districts to approve use of the system on projects throughout the state.
Erie’s North Water Reclamation Facility is undergoing major improvement to increase capacity for the growing town. The improvements will continue until 2028 as the plant is upgraded to a Class A facility which can provide safe water for additional applications. Archer Western is contracted to perform the work and is using FODS Trackout Control Mats to as the Stabilized Construction Entrance BMP to minimize vehicle sediment tracking.
Maryland DE completes one year on-site review and inspection of FODS Trackout Control System. The Department issues provisional approval allowing local Soil Conservation Districts to approve use of the system on projects throughout the state.
With water scarcity becoming an issue on a national and global scale, water conservation and stormwater pollution prevention are at the forefront of governmental regulations. FODS Reusable Construction Entrances prevent stormwater liabilities by minimizing construction sediment trackout - helping contractors stay NPDES compliant.
The I-10 Flyover Ramp Project aims to reduce congestion from westbound I-10 traffic exiting onto the College Drive exit. The Flyover redirects traffic over the I-12 to eliminate the need to merge past multiple lanes of traffic. FODS Trackout Control System was deployed to reduce construction site sediment tracking.
The Catbird Hotel is constructed on the corner of Marion and Walnut in Denver’s RiNo Arts District. Using innovative building materials, construction crews would assemble each floor in under three weeks as the pre-manufactured structural and exterior panels were delivered to the site. Construction in urban environments requires contractors to deploy effective and safe BMPs to prevent sedimentation and water pollution from exiting vehicles. The FODS Trackout Control Mats were to used on all three site entrances to provide access to the frequent delivery trucks and construction vehicles.
FODS will exhibit at the 2022 World Of Concrete in Las Vegas, Nevada showcasing the effective trackout control system used by contractors across the country. The reusable system is an effective BMP which will reduce trackout and costs. Find out more at the World Of Concrete West Hall Booth #W1077.
In response to rapid urban expansion, The Opus Group (Opus) began construction of its third multi-family development in Denver’s Jefferson Park neighborhood. The experienced building and engineering teams found solutions to the unique challenges posed by the varied topography and space constraints of the project. Opus installed FODS Reusable Construction Entrance System on the three entrances to minimize vehicle sediment tracking onto the active roads.
Interstate 25 is a major north-south interstate which connects Denver and cities and communities along the Front Range to the National Highway System. The growing population prompted expansions both north and south of the Denver Metro area. FODS Reusable Construction Entrance System enables contractors to quickly establish stabilized access points during each phase of the project.
The Cumberland County Landfill was opened in the 1970s and is a municipal solid waste landfill that contracts with residual waste generators in Pennsylvania and surrounding states. To minimize trackout, the FODS Stabilized Construction Entrance was installed near the site’s weigh station. The system provides an effective solution to vehicle sediment tracking enabling increased compliance at reducing operating costs.
The Big Dry Creek Sewer Improvements Project involves the renovation of 14 miles of sewer pipeline in the city of Westminster, CO. The renovation will increase capacity and prepare the city’s infrastructure for future developments. The frequent relocation of construction zones throughout the project prompted the contractor to choose a reusable and portable construction entrance to stay compliant and mobile.
The HealthONE operated Swedish Medical Center undergoes a fourth major renovation to increase capacity with the development of a six-story new patient tower. The construction will be conducted while the hospital remains open presenting challenges which are met by innovative solutions.
Los Angeles Landside Access Modernization Program (LAMP) is under development by a Fluor JV. The project requires a construction entrance solution that can mitigate sedimentation, dust, and foreign objects (FOD) near airport access roads. FODS Trackout Control Mats were deployed in multiple locations throughout the project.
Ball Aerospace Expansion Project in Broomfield near the Rocky Mountain Metropolitan Airport continues to operate a clean working area to reduce FOD and sedimentation from construction site exits. To provide the best possible performance, the contractor has installed FODS Trackout Control Mat System to clean vehicle tires as they exit the site.