Chat with us, powered by LiveChat
FODS_STABILIZED_CONSTRUCTION_ENTRANCE_Contractor-Resources_specs-stabilized-construction-entrance-detail-rock-less_construction_entrance_track_out_control_Vehicle_Trackout_Control_Vehicle_Track-out_Control_VTC.jpg

CONTRACTOR RESOURCES

 

FODS Contractor Support

Downloads

FODS Trackout Control System overcomes the limitations and challenges of traditional stabilized construction entrances. When using FODS it is important to ensure that you have the proper mat layout, product knowledge, hardware, and tooling to ensure you and your team install your FODS Reusable Construction Entrance Properly. As former contractors FODS knows that issues, questions, and concerns arise in the field. That is why we always are available to provide direct one on one support.

Install Video

Downloads

Overview

FODS Brochure
Install Guide
Maintenance Guide
Standard Layout (1x5T)
Additional Drawings
ROI Calculator

Technical

FODS Mat TDS
Engineering TDS
Hardware TDS
Anchoring TDS
Tooling TDS
Standard Layout (1x5T)
Additional Drawings
Written Spec (pdf)
Written Spec (doc)

Video

Installation
1.9 Million Pounds
Will it climb?
Will it crush?
FODS Overview
Colorado I-70 Project

Additional

Distributor Resources
Specifier Resources
Spanish Resources

 

FODS IN Your State

 
 

FAQ

How does the FODS Trackout Control System work?

FODS Trackout Control Mats are designed to completely replace aggregate stabilized construction entrances. The purpose and design of the FODS Trackout Control Mats are to effectively remove sediment from vehicle tires as they exit a disturbed land area onto a paved street meeting BMP requirements.

FODS Reusable Rockless Construction Entrance is designed with alternating rows of pyramids that are specifically engineered to open tire lugs as vehicles pass over, causing the mud to loosen and fall out into the base of each mat.

The mud collects at the base of the mat and will not come in contact with the tires of subsequent vehicles, preventing mud, debris, and other pollutants from leaving a worksite and entering roadways, or storm water system. Learn More

What are the dimensions of a single FODS Trackout Control mat?

FODS tracking pads are 12' wide across the entrance and 7' long in the direction of travel. Mats each weigh 430lbs. Mats can be nested for easy stacking, storage, and transport. The mats will not exceed the width requirements for highway transportation. Learn More

How do I install FODS Trackout Control Mats?

The FODS construction entrances are transported to the construction site on a large truck or trailer. The mats will then be off loaded into place with a forklift, truck mounted boom or jib crane on the in situ soils. No excavation or disturbance of the existing soil is necessary.

Once the mats are correctly situated in place, steel hardware are used to connect the mats together. Form Stakes can be manually torqued ot installed through pre-drilled holes located on the outer edges of the FODS mat. We recommend a minimum of two anchors per mat. Learn More

How are FODS Trackout Control Mats cleaned?

When 2.5" of sediment builds up between the pyramids the mats should be cleaned. FODS Construction Exit mats are easy to clean by hand or with powered equipment. A FODS Shovel is designed to fit between the pyramids and can be used to quickly remove debris.

Other options include:

  • Skid-Steer with broom attachment
  • Street Sweeper (requires adjusted bristle head)
  • Pressure Washer (must have ability to contain water)
  • Water Truck (must have ability to contain water)

    Learn More

     
    STABILIZED+CONSTRUCTION+ENTRANCE_rock-less_construction_entrance_track_out_control_mud_mats_mudmats_access_road_industrial+trackout_Vehicle_Trackout_Control_Vehicle_Track-out_Control_VTC_rip-rap_+codot_construction_entrance_Colorado_Construction_ent…

    Fods In the Field