FODS LLC is pleased to announce our new Japanese distributor, M-Cross International Corporation (MCIC). As an export specialist, MCIC identifies opportunities to introduce products which can meet the needs of their customers.
Minimize and mitigate land disturbing activities with FODS Reusable Construction Entrances. Our stabilized construction access design will clean your tires more effectively than the old way of using rock or rumble grates.
In the pursuit of a cleaner, safer construction site entrance, FODS engineers designed FODS Reusable Construction Entrance - an entrance that makes sense with conditions that exist on all construction sites.
Marcellus Formation Fracking requires high volumes of vehicles entering and exiting the site through the stabilized construction entrance. The operator of this site needed a heavy-duty, effective trackout control solution, so they installed the FODS Trackout Control Mats. Learn More.
The growth of technology companies is spurring demand for high-performance solutions for minimizing pollution both during and after construction. Technology companies often have unique needs for LEED standards energy sourcing to minimize their environmental impact. FODS Trackout Control Mats enable contractors to minimize trackout on a variety of demanding applications and preserve the natural water sources.
FODS Reusable Construction Entrances are quick and easy to transport, install in a matter of minutes and provide utility contractors with a defensive barrier between tough utility construction debris and adjacent public roadways
Industries across Texas are using FODS to provide cost-effective, and environmentally friendly construction entrances that reduce trackout and maintenance.
Industrial site operators and contractors face additional challenges during the winter months. Maintaining a compliant stabilized entrance often requires frequent top-dressing with additional rock to prevent rutting and trackout. FODS All-Weather trackout control system continues to perform in wet weather.
Congratulations to FODS Summer Sweepstakes Third Place Winner, Brian Wickham, Geotechnical Product Manager at Construction Supply Group. As part of Soil Tech’s NPDES, Soil Tech also implemented a six mat FODS Reusable Construction tract at the entrance to the restoration site